Infrastructure
Roads, power, water and drainage are already in place, so you can start building as soon as your drawings are approved.
- 15 m
- Main roads, 10 m RCC carriageway
- 150 mm
- Water pipeline along the roads
- DGVCL
- Power line brought to the park
- 3,308 sq.m
- Common plots, with a pond
Built for trucks
Every plot faces a 15 m or 12 m road. Inside each 15 m road is a 10 m RCC carriageway, with drains on both sides and street lights along the way.
Provided at the park
These are in place today.
Internal roads
ProvidedTwo 15 m roads with a 10 m RCC carriageway, and a 12 m branch road with a 9 m carriageway: about 481 m of RCC road in all. Every plot faces one of them.
Power
ProvidedA DGVCL electricity line is brought to the park. You apply to DGVCL for your own connection and load.
Water
ProvidedA 150 mm water pipeline runs along the internal roads, about 457 m in all.
Drainage
ProvidedDrains run along the internal roads.
Street lights
ProvidedAlong the internal roads.
Compound wall and gate
ProvidedA walled boundary with one controlled entry from the village road.
Security and CCTV
ProvidedA guarded gate and CCTV cameras.
Water pond
ProvidedIn the larger common plot, inside the park.
Also on the approved layout
Shared spaces and green cover planned for the whole park.
Two common plots, 3,308 sq.m
CP-1 of 2,508.51 sq.m and CP-2 of 799.46 sq.m. They belong jointly to the plot owners, as the NA order requires.
52 parking bays
Marked bays of 4 m × 5 m, in addition to the loading bay inside every plot.
1,344 trees
Tree plantation planned across the park.
14 rainwater recharge wells
To put rainwater back into the ground.
Fire safety
The layout carries fire prevention and life-safety provisions under Gujarat's 2023 fire-safety regulations.
How the land is used
53,696 sq.m (13.27 acres) in all, from the area statement on the approved layout.
- Plots, 26 of them42,924 sq.m, 79.9%
- Roads7,068 sq.m, 13.2%
- Common plots3,308 sq.m, 6.2%
- Setback and other land396 sq.m, 0.7%